Bridge construction

Posted by jyuhasz
Object id: 
LF.02048

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows north span of bridge, supported by twenty one visible sets of concrete pillars with beginnings of centre span and supports at end of span, over the Fraser River.

Date: 
September 17, 1962
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02046

Two black and white images of the course of construction on the Port Mann Bridge. Photograph shows rows of small concrete and rebar pillars, partially submerged in water, some labeled "66"; two cranes at end of rows of pillars; north approach to bridge in background, culminating in partial centre span in far right of image.

Date: 
September 17, 1962
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02045

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows underside of concrete approach to main span of the Port Mann Bridge, supported by thirteen sets of concrete pillars; forested area in background

Date: 
[1963]
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02043

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows partial steel truss bridge span on concrete pier supports with three cranes on top of bridge deck; girders on bridge span labeled "MADE BY DOMINION BRIDGE CO. LTD."; north approach leading, but not connected to, span with shore of Fraser River in background.

Date: 
January 25, 1963
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02038

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows north and south support for centre span of steel tied arch bridge with crane on either end; concrete frame supports bridge deck extending from abutment in right of image.

Date: 
June 12, 1963
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02037

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows south support for centre span of steel tied arch bridge with crane on either end; base girders of bridge deck labeled "DOMINION BRIDGE"; concrete frame supported bridge deck extending from abutment in right of image with railway tracks in foreground.

Date: 
July 18, 1963
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02036

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows south support for centre span of steel tied arch bridge with crane on either end; base girders of bridge deck labeled "DOMINION BRIDGE"; cars parked in lot underneath bridge in foreground of image.

Date: 
July 18, 1963
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.02023

Black and white image of the course of construction on the Port Mann Bridge. Landscape shows two cranes atop disconnected segments of centre arch span of truss bridge with large log boom floating underneath; shores of Fraser River in background.

Date: 
September 14, 1963
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.04062

Two black and white images of boats at the scene of the collapes of the Second Narrows Bridge (later renamed the Ironworkers' Memorial Second Narrows Crossing).

Date: 
June 17, 1958
Source: 
Landauer, Barbara
Posted by jyuhasz
Object id: 
LF.03132

Two black and white images of the course of construction on the Port Mann Bridge.

Landscape shows crane atop bridge span labeled "WESTERN BRIDGE" extended over Fraser River; two cranes on barge underneath span; one concrete pier with pillars yet to be connected to span in left of image.

Date: 
January 12, 1962
Source: 
Landauer, Barbara